Your Cash Flow Variables

Construction Costs Draw Type - (A,P, S, or W)    *Required Value

A - The total construction costs for each unit in each period make up the draw amount in the Cash Flow table. No loan ceiling check. The draw amount is the raw cost total. We do not consider any loan balance nor do we validate whether we would overdraw the loan. Any Unit without a loan set up in jlhouses is excluded from the Cash Flow Projection.

P - Progress draws indicate you have a Construction Loan amount set up for each Unit. The total construction costs for each unit in each period make up the draw amount in the Cash Flow table until you reach a $0 amount remaining for that Unit's loan amount.

S - Schedule driven draws indicate you use the Construction Loan system available within MarkSystems. You have Draw Schedules set up and connected to the Scheduling System for the Draw Dates.

W - Weekly draws indicate you have a Construction Loan amount set up for each Unit. The amount is divided by the number of weeks remaining on the schedule until you reach the Final Weekly Draw Activity Code.

Final Weekly Draw Activity Code - (???)    *Required Value if you chose 'W' above

You only need to provide this Activity Code if you selected "W" - Weekly Draws above.

This is your schedule activity code you recognize at the final ability to draw on your Construction Loan for a Unit. This may be the same as the Settlement Activity Code, the Schedule Finish Activity Code, or any other Activity Code you wish to use from your schedule system.

Draw Sworn Statement Signature Image - (?????.png)    

If you have subscribed to the Pulse™ Sworn Statement generation system, this will be the name of the image file you provide to the Pulse™ for us to upload to be used as a signature for yourteam member that manages your sworn statement process.